How a Stonetta contracting project runs - from first enquiry to handover - and the quality checks built into every stage.

Execution Workflow

A Roadmap You Can Plan Around

Because sourcing, fabrication and installation sit under one roof, our workflow has no external handoffs. Each stage has a named owner, a deliverable and a QA hold point before the next stage begins - so consultants and main contractors can plan around a programme that holds.

Process Roadmap

Ten Stages, One Team

Stage 01

Enquiry

Scope, drawings or BOQ received; project registered and a single point of contact assigned.

Stage 02

Site Survey

Dimensions, levels, substrate and access verified on site.

Stage 03

Estimation

Material take-off and priced proposal, supply-only or supply-and-apply.

Stage 04

Value Engineering

Alternative stones, formats and fixing methods proposed to meet budget without losing the design intent.

Stage 05

Shop Drawings

Setting-out, cutting lists and fixing details issued for consultant approval.

Stage 06

Mock-ups

Sample panels and dry-lays approved before full fabrication.

Stage 07

Fabrication

Slabs cut, profiled and inspected in-house.

Stage 08

Installation

Our own crews place, level, seal and finish on site.

Stage 09

QA / QC

Hold-point inspections, snag lists and rectification.

Stage 10

Handover

Final walkthrough, sign-off, care guidance and aftercare support.

QA / QC Procedures

Quality Checks at Every Stage

Material inspection

Every slab checked for colour, veining, thickness and defects before it is cut.

Dry-lay approval

Layouts assembled and photographed for client approval before dispatch.

Installation hold points

Substrate, setting-out, levels and joints inspected before each area is closed.

Snagging & sign-off

Formal snag list, rectification and handover documentation.

HSE & Standards

Safety, Standards and Compliance

HSE policy

Site-specific risk assessments, method statements and permit-to-work for every installation.

ISO standards

Quality, environmental and safety management certifications - to be listed.

Documentation

Submittals, material approvals, test reports and as-built records issued per project.

Licensed contractor

Stonetta Stone Contracting L.L.C - Dubai DED Industrial Licence No. 1502133.

Placeholder - HSE policy document, ISO certificate numbers and third-party approvals to be confirmed by Stonetta.

Tendering a Stone Package?

Send us the tender documents and we will return a priced, programme-aligned proposal.